Fecha/Hora
Date(s) - 21/09/21
5:00 pm - 6:00 pm
Categorías
CSP can play a key role in a grid dominated by renewable energy due to the fact that is dispatchable. Nevertheless, the complexity of CSP installations can undermine the profitability, competitiveness and even viability of the project. The National Renewable Energy Laboratory (NREL) has developed a blueprint study on the best practices for CSP to develop stronger CSP projects with lower project costs and improved long-term plant operation.
We invite you to join ATA Insights upcoming webinar “CSP Simulators: optimization from design to operation” (September 21st at 17:00 CEST / 11:00 NY) where experts will analyze proven CSP planning, construction, startup and O&M best practices; and will discuss how can simulators enhance CSP plant results in terms of economy, safety, and reliability during the whole lifecycle of the plant. Join and:
- Hear about using simulators as an engineering tool, allowing the prompt refining of the design, and optimizing design changes in any project phase
- Find out how simulation can reduce commissioning times and the minimize of unforeseen events during this phase
- Understand how moving from an engineering simulator to a training simulator supports O&M team decision making and improves the efficiency, safety and availability of the installation.
Sign up here: https://bit.ly/2XapLVC
We look forward to seeing you there. If you have any question, please do not hesitate to contact us by writing to Valeria Garcia at andres.luengo@ata.email